About this page. This story was reported by Asaase Radio. The full report, its pictures and its author's byline are at the source.
Loading page
The government has directed Joshob Construction Limited to resume work on the 7.2-kilometre Tema-TOR road, which is about 35% complete despite an original 24-month timeline that began in December 2020.
About this page. This story was reported by Asaase Radio. The full report, its pictures and its author's byline are at the source.